ALHIZAM ALFIDIY ENG. Co.ALHIZAM ALFIDIY ENG. Co.For Contracting & General Trading Ltd
Iraq · Engineering Excellence Since 2004

Powering Iraq'sEnergy Futurewith Engineering

A leading Iraqi contractor delivering high-voltage transmission, power distribution, substations, renewable energy and EPC solutions — safely, sustainably, to international standards.

0+Projects delivered
0+Years of experience
0%HSE compliance
Ministry of ElectricityNational GridBasra Oil Co.Iraq CementSouth RefineriesSolar IraqBaghdad UtilitiesKRG EnergyMinistry of ElectricityNational GridBasra Oil Co.Iraq CementSouth RefineriesSolar IraqBaghdad UtilitiesKRG Energy
Engineering the infrastructure that keeps Iraq moving
0+Years building Iraq's power backbone
Who We Are

Engineering the infrastructure that keeps Iraq moving

ALHIZAM ALFIDIY General Contracting is a leading Iraqi company specialising in electrical infrastructure, power transmission & distribution, renewable energy, oil & gas services, industrial contracting, EPC solutions, engineering consultancy and operation & maintenance.

Integrated EPC capability

Engineering, procurement and construction under one accountable team — from design to energisation.

Safety-first culture

Certified HSE management protecting our people, clients and communities on every site.

Sustainable energy focus

Utility-scale solar and renewable systems accelerating Iraq's clean-energy transition.

Partner with us
Consulting Engineer Abdul Karim Mutlak Al-Tamimi

"We work to be a trusted Iraqi partner in energy and infrastructure — delivering with quality, safety and commitment."

Consulting Engineer Abdul Karim Mutlak Al-TamimiChairman of the Board
Read the Chairman's Message
Engineering Capabilities

End-to-End Engineering Capabilities

Nine core capabilities covering the full lifecycle of power projects — hover to explore each.

Transmission Lines

Overhead & underground high-voltage transmission lines across Iraq.

Up to 400kVSingle / double circuitTower & foundation designConductor stringing
Related projects
  • Al-Hartha – Qurna 400kV
  • Shatt Al-Basra – Bab Al-Zubair

Substations

Turnkey GIS & AIS substations from engineering to energisation.

GIS & AISProtection & controlSCADATesting & energisation
Related projects
  • New Samawah Substation
  • Basra Center 400kV

High Voltage

High & extra-high voltage solutions for critical power infrastructure.

132 / 400 kVPower transformersSwitchgear & breakersEarthing & protection
Related projects
  • 250 MVA Auto-Transformer
  • Basra Autotransformer

Cable Installation

Power & control cable laying via open-cut and directional drilling.

132kV power cablesHDD directional drillingJoint bays & manholesOPGW optical cables
Related projects
  • Zayouna – Al-Ameen 400kV
  • Ta’mim – Ameriya

Solar Energy

Utility-scale PV plants and rooftop systems, EPC delivered.

EPC deliveryGrid connectionRooftop systemsMonitoring & performance
Related projects
  • Solar systems – Basra
  • Hybrid solutions

Oil & Gas

Electrical & instrumentation works for upstream and downstream.

E&I systemsClassified (Ex) areasIn-field networksStrict HSE
Related projects
  • Oil facility power systems
  • Al-Nakhilah – Najibah

Civil Works

Foundations, trenches, buildings and concrete structures for power projects.

Reinforced concretePower & control trenchesGIS hallsRoad crossings
Related projects
  • Civil works – Al-Hartha
  • Bab Al-Zubair GIS building

Testing & Commissioning

System testing and commissioning to standards before handover.

Protection testsTransformer testingInsulation checksEnergisation
Related projects
  • 132kV substation commissioning
  • Transmission line testing

Maintenance

24/7 preventive and predictive maintenance for maximum availability.

24/7 maintenancePreventive programsRapid responseSLA agreements
Related projects
  • Distribution network O&M
  • Substation technical support

A track record measured in megawatts

0+
Projects completed
0+
MW capacity built
0+
Km lines installed
0%
Client retention
Why Silver Belt

The partner of choice for critical infrastructure

Certified Quality

ISO-aligned processes and rigorous QA/QC on every project.

Uncompromising HSE

A safety culture that protects people, assets and communities.

Expert Teams

Iraqi and international engineers with deep sector expertise.

Sustainable Delivery

Clean-energy focus and environmentally responsible methods.

Quality Marks

Quality marks & seals

IOS 9001:2015

IOS 9001:2015

ISO

ISO 14001:2015

ISO 14001:2015

ISO

ISO 45001:2018

ISO 45001:2018

ISO 45001:2018

Our Portfolio

Featured projects across Iraq

From national grid substations to utility-scale solar — engineered, built and maintained by our teams.

Transmission 21
Explore project

Construction of the Al-Faw 400 kV – Industrial Institute 132 kV Transmission Line,

Basra 02-08-2022
Completion 100%
Transmission 11
Explore project

Execution of Concrete Foundation Casting Works (Materials and Labor), Construction and Erection of Four (4) High-Voltage Transmission Towers, Type (2S2), for the Transmission Line Interconnection Project (North Kut 132 kV Substation – Wasit 400 kV Substation)

Wasit 28-10-2013
Completion 100%
Transmission 10
Explore project

Tender for the Execution of Stringing Works for the Power Transmission Line Connecting the Nineveh Gas Power Plant (Qayyarah) to the Yarmjah Secondary Substation (132 kV),

Nineveh 18-03-2020
Completion 100%
Transmission 4
Explore project

Tender for the Construction of the 400 kV Electrical Power Transmission Line, Salah Al-Din Thermal Power Station Branch – West Baghdad (2)

Salah Al-Din 13-10-2020
Completion 100%
Transmission 5
Explore project

Execution of Works for Damaged Manholes and Sewer and Water Pipes for Sections (1–24) of the 132 kV Cable Project (Zayouna – Al-Amin 400 kV).

Baghdad 2018
Completion 100%
Transmission 4
Explore project

132 kV Cable Project (Al-Najibiya Gas Power Station – Al-Najibiya Thermal Power Station).

Basra 21-03-2021
Completion 100%
Transmission 8
Explore project

Tender No. 113/Net/2014 – Execution (Materials + Labor) of the Cable Route from Al-Najibiya Gas Power Station to Basra Center/2, comprising two double-circuit cables.

Basra 25-04-2015
Completion 100%
Transmission 16
Explore project

Al-Hamidiya – Al-Anbar Combined Cycle 400 kV Transmission Line Project (1+2), Double Circuit, Phase II.

Anbar 13-03-2025
Completion 92%
Transmission 3
Explore project

Tender No. 69/NT/2012 for the Execution (Materials + Labor) and Construction of a 20 × 15 m Covered Shed

Baghdad 16-12-2012
Completion 100%
Substations 11
Explore project

Award of civil works for the construction of two 132 kV bays at Al-Hartha Thermal Power Station.

Basra 18-03-2019
Completion 100%
Transmission 11
Explore project

Tender for the Award of Supplementary Works for the South Nasiriyah 400 kV Substation – Phase II, including the 132 kV Line Incomers (Al-Masab Al-Aam – Suq Al-Shuyukh Branch).

Nasiriyah 18-11-2019
Completion 100%
Substations 4
Explore project

Execution of civil works for Autotransformer No. 6 and its accessories at the Basra 400 kV substation.

Basra 18-03-2019
Completion 100%
Substations 3
Explore project

Contract award for the supply of a 132/33 kV, 63 MVA mobile substation for the New Rumaitha 132 kV secondary substation site.

Al-Muthanna 30-09-2024
Completion 100%
Transmission 6
Explore project

Project for the supply of cable-specific materials.

Basra 30-09-2024
Completion 100%
Transmission 5
Explore project

Execution of 132 kV power-cable laying works (Zayouna–Al-Ameen 400 kV)

Baghdad 2018-2018
Completion 100%
Transmission 2
Explore project

Execution of power-cable laying works for the Zayouna–Al-Ameen 400 kV cable project.

Baghdad 2018
Completion 100%
Substations 12
Explore project

Execution of cabling works for the Al-Ghadeer 132 kV mobile substation.

Basra 02-04-2019
Completion 100%
Substations
Explore project

Preparation of control cables in various sizes for secondary substations.

Basra 15-12-2020
Completion 100%
Transmission 11
Explore project

Tender No. 7/NET/2011: Execution on a materials-and-labour basis for the West Basra–Basra 400 kV and East Basra–West Basra projects.

Basra 05-05-2011
Completion 100%
Transmission 8
Explore project

Execution of reinforcement and concrete casting works for power cable trenches, including the supply of materials and labor, as part of the project for the two electrical substations (Basra Center – Basra 400 kV).

Basra 06-05-2012
Completion 100%
Transmission 11
Explore project

Construction of the 400 kV Overhead Transmission Line (Al-Hartha Thermal Power Station – Qurna 400 kV Substation), with a total length of 65 km

Basra 17-02-2021
Completion 100%
Transmission 8
Explore project

Construction of the Maysan JBIC – Al-Amarah 400 kV Overhead Transmission Line (Tower Line), Circuit /2

Maysan 08-03-2022
Completion 100%
Transmission 5
Explore project

Qurna 400 kV Substation – Al-Amarah 400 kV Substation Transmission Line

Maysan 15-11-2022
Completion 100%
Transmission 12
Explore project

New Al-Samawah – North Al-Samawah Substation Project, comprising two double-circuit cable sections (Sections 1–5)

Al-Samawah 26-06-2016
Completion 100%
Transmission 8
Explore project

Rerouting of the Najibiyah / Basra Center 2 / East Basra 132 kV Underground Cable Route

Basra 18-05-2019
Completion 100%
Transmission 11
Explore project

Construction of the Al-Samawah Gas – New Al-Samawah 132 kV Transmission Line Project (Underground Cable), Double Circuit

Al-Samawah 24-12-2023
Completion 100%
Transmission 12
Explore project

Construction of the Al-Samawah Gas – New Al-Samawah 132 kV Transmission Line Project (Overhead ), Double Circuit.

Al-Samawah 24-12-2023
Completion 100%
Transmission 8
Explore project

Installation of 132 kV Cable (Nasiriyah Thermal Power Station – Old Nasiriyah Substation)

Nasiriyah 11-05-2019
Completion 100%
Transmission 8
Explore project

Supply and Installation Contract No. (MT-DI-14/2023) for the Ta'mim – Ameriya Power Cable Project

Baghdad 15-04-2024
Completion 100%
Substations 11
Explore project

Construction of the GIS/33 kV Hall Building at the Old Bab Al-Zubair Substation.

Basra 09-02-2020
Completion 100%
Substations 6
Explore project

Installation of 250 MVA Auto-Transformer No. 3 at Al-Hartha Thermal Power Station

Basra 02-05-2019
Completion 100%
Transmission 22
Explore project

Execution of a 400 kV transmission line (Al-Faw – Shatt Al-Basrah Gas Power Station) with a length of (110) km

Basra 18-02-2021
Completion 100%
Transmission 3
Explore project

Tender-no-71-nt-2013 (Materials + Labor) Al-Nakhilah – Najibah Gas Power Station.

Basra 02-06-2024
Completion 100%
Substations 4
Explore project

Installation of 132 kV Power Cables for the North Qurna – Qurna (400 kV) Project

Basra 18-08-2019
Completion 100%
Transmission 9
Explore project

Construction of the Shatt Al-Basra – Bab Al-Zubair/2 132 kV Transmission Line

Basra 25-10-2021
Completion 100%
Distribution
Explore project

Replacement of Eight 11 kV Feeders

Basra 24-08-2021
Completion 100%
Transmission 16
Explore project

Contract for the Supply and Installation of 132 kV Power Cables for the North Hilla – Hilla (1+2) Project

Al-Hillah 13-11-2023
Completion 100%
Transmission
Explore project

Supply and Installation of 132 kV Power Cables 1 × 1 × 2000 mm² and Complete Accessories for the following Projects: Al-Qayyarah – Al-Tijar Project North Baghdad 400 kV – Al-Tijar Project Al-Qayyarah – New Jameela Project

Baghdad 25-05-2025
Completion 10%
Transmission 10
Explore project

Supply, Installation, Testing and Commissioning of 132 kV Power Cable System, including all associated accessories, terminations and joints, using 1×800 mm² cables for a double-circuit system, with a total route length of 9.5 km.

Baghdad 12-05-2024
Completion 100%
Substations 10
Explore project

Tender No. 25/NT/2013 – Execution of Works (Supply of Materials + Labor) for the North Baghdad Substation – Al-Shaab Substation Project

Baghdad 31-07-2013
Completion 100%
Transmission 4
Explore project

The 132 kV transmission line project (Al-Zaqoura – Industrial – Al-Nasiriyah Combined Cycle).

Nasiriyah 22-10-2019
Completion 100%
Nationwide Presence

Our projects across Iraq

Explore our work by governorate. Filter by sector, search, and select a province to view its projects.

Babylon — بابلAnbar — الأنبارDiyala — ديالىSulaymaniyah — السليمانيةWasit — واسطMaysan — ميسانDhi Qar — ذي قارQadisiyah — القادسيةMuthanna — المثنىBasra — البصرةBaghdad — بغدادKarbala — كربلاءNajaf — النجفSalah al-Din — صلاح الدينNineveh — نينوىErbil — أربيلKirkuk — كركوكDahuk — دهوك
Client Voices

Trusted by ministries, operators & industry

ALHIZAM ALFIDIY delivered our substation ahead of schedule and to an exceptional standard of safety and quality.

E
Eng. Ahmed K.Ministry of Electricity

Their EPC team managed a complex grid connection flawlessly — true engineering professionals.

S
Sarah M.Independent Power Producer

A reliable partner for our industrial electrification. Responsive, safe and technically excellent.

O
Omar T.Industrial Group
Newsroom

Latest news & insights

August 2026
Projects

Groundbreaking on 200MW solar park

A milestone project strengthening the national grid for the high-demand season.

Read more
August 2026
Transmission

New 400kV line energised ahead of summer peak

A milestone project strengthening the national grid for the high-demand season.

Read more
Get in Touch

Let's build your next project

Business HoursSaturday – Thursday · 8:00 AM – 4:00 PM

We typically respond within one business day.

Baghdad, Republic of IraqGet Directions

Ready to energise your next project?

Talk to our engineering team about transmission, distribution, solar or EPC delivery — anywhere in Iraq.